STEP 2
1.
Install Transportation Wheels (No.87) with Button Head Bolts (No.209) and Nyloc Nuts
(No.161).
2.
Place the Console Mast (No.2) through the Console Mast Cover (No.76) with the correct
orientation. Snake the Computer Cable through the bottom end of the console mast and out
through the top.
3.
Insert the mast on the Main Frame and use Hex Head Bolts (No.208) with Split Washers (No.211),
Flat Washers (No.169) and Nyloc Nuts (No.206) to secure on the side. Then use Hex Head Bolts
(No.207) and Curved Washers (No.210) to secure at the front and back of the tube.
HARDWARE
#161. 5/16" × 6T
#169. 3/8" ×19 × 1.5T
Nyloc Nut (2 pcs)
Flat Washer (2 pcs)
#211. 10 x 2T
#210.
Split Washer
Curved Washer (2 pcs)
(2 pcs)
Customer Service 1-888-707-1880
Email: customerservice@dyaco.ca
#206. 3/8" × 7T
Nyloc Nut (2 pcs)
Ø
#207. M8 × 16mm
8 × 23 × 1.5T
Hex Head Bolt (2 pcs)
#209. 5/16" × 1-3/4"_Button
Head Socket Bolt (2 pcs)
10
#208. 3/8" × 2-1/2
Hex Head Bolt (2 pcs)
Dyaco Canada Inc. 2021