Modulating - Trane IntelliPak WEHE Series Installation, Operation And Maintenance Manual

Commercial rooftop air handlers with cv, vav, or szvav controls
Table of Contents

Advertisement

Figure 17. 500 and 850 MBH - unit gas trains (natural
gas)
Figure 18. 500 and 850 MBH - unit gas trains (natural
gas)
Figure 19. 235 and 350 MBH - unit gas trains (natural
gas)
RT-SVX35H-EN

Modulating

Figure 20. Modulating gas valve
Pilot Shutoff Valve
Pilot Shutoff Valve
Modulating Gas Valve
Modulating Gas Valve
Flue Assembly Installation
1. Locate the flue assembly and the extension (refer to
Figure 21, p. 38
for extension usage).
2. Install the flue extension onto the flue assembly as
shown in
Figure
21.
3. Slide the pipe clamp onto the heater flue tube located
inside the heater compartment.
4. Insert the tube on the flue assembly into the hole
located in the vertical support for the heat section.
5. Butt both flue tube sections together and center the
pipe clamp over joint.
6. Using the pre-punched holes in the flue assembly,
extension, and the vertical support, install the
appropriate number of mounting brackets. Refer to
Figure 21
for details.
Installation
Burner Nozzle
Burner Nozzle
Pilot Solenoid Valve
Pilot Solenoid Valve
Pilot Regulator Valve
Pilot Regulator Valve
Pilot Shutoff Valve
Pilot Shutoff Valve
Shutoff Valve
Shutoff Valve
37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents