Trane IntelliPak WEHE Series Installation, Operation And Maintenance Manual page 105

Commercial rooftop air handlers with cv, vav, or szvav controls
Table of Contents

Advertisement

Service & Maintenance
6. Recheck the tension of the new belts at least twice
during the first 2 to 3 days of operation. Belt tension
will decrease rapidly until the new belts are "run in".
Readjust the belt tension as necessary to correct for
any stretching that may have occurred.
Table 40. Belt tension measurement and deflection ranges
Belts
Cross
Small P.D
Section
Range
3.0 -3.6
A
3.8 - 4.8
5.0 - 7.0
3.4 - 4.2
B
4.4 - 5.6
5.8 - 8.8
Belt
Cross
Small P.D
Section
Range
4.4 - 8.7
5V
7.1 - 10.9
11.8 - 16.0
Figure 57. Belt span
104
Deflection Force (Lbs.)
Super Gripbelts
Min.
Max.
Min.
3
4 1/2
3 7/8
3 1/2
5
4 1/2
4
5 1/2
4
5 1/2
5 3/4
5 1/8
7 1/8
6 1/2
6 3/8
8 3/4
7 3/8
Deflection Force (Lbs.)
358 Gripbelts
358 Gripnotch Belts
Min.
Max.
Min.
------
------
10 1/2
15 3/4
12 7/8
13
19 1/2
Gripnotch
Steel Cable Gripbelts
Max.
Min.
5 1/2
3 1/4
6 1/4
3 3/4
5
6 7/8
4 1/4
8
4 1/2
9 1/8
5 3/4
10 1/8
7
Max.
10
15
18 3/4
15
22
Max
4
4 3/4
5 1/4
5 1/2
7 1/4
8 3/4
RT-SVX35H-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents