Section 14. Electrical - High Voltage - Trane GAF2A0A36S3AEC Installer's Manual

50 hz convertible air handlers 3 – 5 ton
Table of Contents

Advertisement

Section 14. Electrical - High Voltage

14.1 High Voltage Power Supply
The high voltage power supply must match the
equipment nameplate.
Power wiring, including ground wiring, must comply
with national, state, and local codes.
14.2 Make Electrical Connections
Note: GAF2 air handlers ONLY allow top
position for conduit connection.
STEP 1 - Route High Voltage wiring to unit.
STEP 2 - Select a conduit entry point. Drill a hole
for the desired conduit size (up to 1-1/2" for GAM2
models and up yo 3/4" for GAF2 models). Locating
targets are identified on the units.
1. Select the entry point you will use to bring in
your high voltage wiring.
Note: When drilling access through cabinet do not
drill into any internal components. Remove internal
components before drilling through cabinet if possible.
Damage to the air handler or heater could result.
WARNING
L
!
LIVE ELECTRICAL COMPONENTS!
During installation, testing, servicing, and troubleshooting of this
product, it may be necessary to work with live electrical com-
ponents. Failure to follow all electrical safety precautions when
exposed to live electrical components could result in death or
serious injury.
Conduit Entry Points
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gaf2a0a36s3ascGam2a0c48s4ascGam2a0c60s5asc

Table of Contents