Chapter 3
Installing and Removing AC- and DC-Power-Supply Modules
To ensure that all power is OFF, locate the circuit breaker on the panel board that services the DC circuit,
Step 1
switch the circuit breaker to the OFF position, and tape the switch handle of the circuit breaker in the
OFF position.
Step 2
Locate the terminal block plug (see
Figure 3-15
Identify the positive and negative feed positions for the terminal block connection. The wiring sequence
Step 3
is positive to positive and negative to negative for both the A and the B feed wires.
The switch front panel shows the positive and negative positions for both the A and B feed wires. (See
Figure
Figure 3-16
1
Positive position
Use an 18-gauge (1 mm) wire-stripping tool to strip each of the four wires coming from the DC-input
Step 4
power source to 0.27 inch (6.6 mm) ± 0.02 inch (0.5 mm). Do not strip more than 0.29 inch (7.4 mm) of
insulation from the wire. Stripping more than the recommended amount of wire can leave exposed wire
from the terminal block plug after installation.
Figure 3-17
0.25 in. (6.3 mm) ± 0.02 in. (0.5 mm)
Step 5
Insert the exposed wire of one of the four DC-input power source wires into the terminal block plug.
Make sure that you cannot see any wire lead. Only wire with insulation should extend from the terminal
block.
OL-16447-01
Terminal Block Plug
3-16.)
Positive and Negative Positions
1
2
2
Negative position
Stripping the DC-Input Power Source Wire
Figure
3-15).
Cisco ME 3400E Ethernet Access Switch Hardware Installation Guide
Power-Supply Module Installation
3-13