Battery Learn Cycle - IBM ServeRAID-MR10M User Manual

Hide thumbs Also See for ServeRAID-MR10M:
Table of Contents

Advertisement

Figure 6.4
Battery Backup Unit Information
6.1.3.1

Battery Learn Cycle

The BBU properties include the following:
The number of times the BBU has been recharged (Cycle Count)
The full capacity of the BBU, plus the percentage of its current state
of charge, and the estimated time until it will be depleted
The current BBU temperature, voltage, current, and remaining
capacity
If the battery is charging, the estimated time until it is fully charged
Learn Cycle is a battery calibration operation performed by the controller
periodically to determine the condition of the battery. You can start
battery learn cycles manually or automatically. To choose automatic
Monitoring the IBBU with the MegaRAID Configuration Utilities
6-11

Advertisement

Table of Contents
loading

Table of Contents