Download Print this page

Install The Cable Management Arm - IBM eServer pSeries 630-6C4 Quick Setup Instructions Manual

Hide thumbs Also See for eServer pSeries 630-6C4:

Advertisement

11

Install the cable management arm

11.1
Take your screwdriver or nut driver,
cable management arm, two 7 mm screws,
and this booklet, and go to the rear of the rack.
Captive
Snap Buttons
Use this size 7 mm screw
to complete this step.
11.3
Slide the system forward to fully extend
cable-management arm.
12
Complete the system installation
You have completed the system-drawer-installation portion of setting up your system. To complete the
cabling and verifying your system hardware portion of the installation, go to Completing Your System
Installation Quick Setup Instructions. T
hardcopy or viewed online at the information center.
The IBM
at
http://publib16.boulder.ibm.com/pseries/index.htm.
To access the quick setup instructions for pSeries and other
pSeries publications, click Hardware documentation.
11.4
Using two 7 mm screws, mount the
other end of the cable management arm
to the bracket that is attached to the system rail.
he quick setup instructions can be printed in
pSeries and AIX Information Center can be accessed
11.2
Using the captive snap buttons, attach the cable
management arm to the rear of the system.
Note: To unlock the snap buttons, pull out the
button section until it stops. Push in the snap
button to lock it.
Go to Box 2.

Advertisement

loading