Download Print this page

IBM eServer pSeries 630-6C4 Quick Setup Instructions Manual page 7

Hide thumbs Also See for eServer pSeries 630-6C4:

Advertisement

8
Attach the cable-carrier support bracket
6 6
8.1
Locate the cable-carrier support bracket,
and position it on the rear of the system
as shown.
8.2
Secure the cable-carrier support bracket with two 5 mm slotted
hex head screws. Tighten these screws with a screwdriver.
9
Install the system onto the rails
CAUTION: The unit weighs between 32 kg (70.5 pounds)
and 55 kg (121.2 pounds). Three persons are required to
safely move it. Using less than three persons to move it
can result in injury.
9.1
Retract the rails if they are open. Using three persons,
grasp the system by its handles, and lift it onto the top
of the rails. Slide the system into the rack.
9.2
3.1
Slowly pull the system out of the frame until the
second screw hole of the inner rail is visible.
Note: Ensure that both inner slide rails follow the
system out of the rack.
9.3
3.1
Install a 5.5 mm screw into the second hole of
each rail. Do not tighten the system retaining
screws until all eight screws have been installed.
9.4
Install the six remaining system-retaining screws. After
all eight retaining screws are in place, use your screwdriver
or nut driver to tighten each screw.
9.5
Slide the system completely into the rack.
Use this size 5 mm screw
to complete this step.
Use this size 5 mm screw
to complete this step.
32-55 kg. (70.5-121.2 lbs.)

Advertisement

loading