Cisco Router ASR 1006 Hardware Installation Manual page 42

Cisco systems router quick start guide
Hide thumbs Also See for Router Cisco ASR 1006:
Table of Contents

Advertisement

Figure 21
Handling a SPA
GND
To install a shared port adapter into a SPA interface processor (SIP), follow these steps:
Step 1
Before you begin, make certain the chassis is grounded.
To insert the SPA in the SIP, locate the guide rails inside the SIP that hold the SPA in place. They are at the top left and
Step 2
top right of the SPA slot and are recessed about an inch.
Carefully slide the SPA all the way in the SIP until the SPA is firmly seated in the SPA interface connector. When fully
Step 3
seated, the SPA might be slightly behind the SIP faceplate. See
Figure 22
Installing and Removing a SPA Into and From a SIP
42
Printed circuit board
Metal carrier
AS R1 00 0-S
IP1 0
SPA -4X OC
3-P OS
SPA -4X OC
3-P OS
PW R STA TUS
AS R1 00 0-S
IP1 0
SPA -4X OC
3-P OS
SPA -4X OC
3-P OS
PW R STA TUS
SPA -4X OC
3-P OS
Figure
SPA -4X OC
3-P OS
SPA -4X OC
3-P OS
SPA -4X OC
3-P OS
22.

Advertisement

Table of Contents
loading

Table of Contents