Installing Cache Boards - HP Visualize b132L Owner's Manual

Hp visualize b132l: owners guide
Hide thumbs Also See for Visualize b132L:
Table of Contents

Advertisement

B_configure.doc 144 Thu Jul 11 10:48:31 1996
Figure 49
NOTICE:
Changing Your Workstation's Hardware Configuration
Installing Second Level Cache Boards
2 Open the ejector tabs on each side of the cache connector and line the cache board
up with the guides making sure that the keying notches along the connector edge
of the board are away from the memory modules, as shown in Figure 49.

Installing Cache Boards

You must install cache boards in pairs of equal size.
3 Press firmly and evenly on the cache board to ensure that it is fully seated. The
ejector tabs will close and engage the notches on the sides of the cache board as
you push down.
4 Perform the procedure in Replacing the Main Tray Assembly on page 110.
144
Keying Notches

Advertisement

Table of Contents
loading

This manual is also suitable for:

Visualize b160lHp 9000 b132lHp 9000 b160l

Table of Contents