Download Print this page

Omron E5 N-H Series Manual page 62

Digital temperature controllers/digital controllers
Hide thumbs Also See for E5 N-H Series:

Advertisement

E5@N/E5@N-H
Advanced Type
Some parameters are not displayed
depending on the model of the Controller and
parameter settings.
For details, refer to the E5CN-H/E5AN-H/
E5EN-H Digital Controllers User's Manual
Advanced Type (Cat. No. H157).
PID Setting Level
Display PID Selection
d.pid
PID1
1
d.pid
M
1.p
c
8.0
M
1.i
233.0
M
1.d
40.0
M
1.olh
105.0
M
1.oll
-5.0
M
1.aut
c
1320.0
M
1.csc
1.00
M
1.lba
0
M
62
Power ON
Manual Control
Level
Operation
Protect Level
Level
Initial Setting
Level
Advanced
Function Setting
Level
Press the O Key less than 1 s.
PID2
2
d.pid
3
PID3
d.pid
PID8
8
M
8.p
c
PID 8 Proportional Band
8.0
M
8.i
PID 8 Integral Time
233.0
M
8.d
PID 8 Derivative Time
40.0
M
8.ol
h
PID 8 MV Upper Limit
105.0
M
8.ol
l
PID 8 MV Lower Limit
-5.0
M
8.aut
c
PID 8 Automatic Selection
1320.0
Range Upper Limit
M
8.c
sc
PID 8 Cooling Coefficient
1.00
M
8.lba
PID 8 LBA Detection Time
0
M
Adjustment
Bank Setting
Level
Level
Communica-
tions Setting
Level
Press the O Key less than 1 s.
Bank Setting Level
d.bnk
Display Bank Selection
Bank0
0
d.bnk
Bank1
1
d.bnk
d.bnk
2
2
Bank2
d.bnk
M
0.lsp
c
0.a
2h
0.0
c
7.lsp
c
M
0.0
M
0.pid
0.a
1
2l
c
7.pid
M
0.0
M
0.spr
c
0.a
-3
off
c
7.spr
c
M
0.0
M
0.a
-1
c
0.a
3h
0.0
c
7.a
c
M
0.0
M
0.a
1h
c
0.a
3l
0.0
c
7.a
c
M
0.0
M
0.a
1l
c
0.sok
0.0
7.a
c
M
1
M
0.a
-2
c
0.wtb
0.0
c
off
M
M
PID Setting
Monitor/Setting
Level
Item Level
Press the O Key less than 1 s.
Bank7
7
M
Bank 7 SP
7.a
-2
0.0
c
Bank 7
Alarm Value 2
M
0.0
M
Bank 7 PID
Set No.
7.a
2h
Bank 7
1
c
Alarm Value
0.0
M
Upper Limit 2
M
Bank 7 SP
Bank 7
Ramp Set Value
7.a
2l
off
c
Alarm Value
M
0.0
Lower Limit 2
M
-1
Bank 7
Alarm Value 1
7.a
-3
0.0
c
Bank 7
Alarm Value 3
0.0
M
M
1h
Bank 7
Alarm Value
7.a
3h
Bank 7
0.0
c
Upper Limit 1
Alarm Value
0.0
M
Upper Limit 3
Bank 7
M
1l
Alarm Value
Bank 7
7.a
3l
0.0
c
Lower Limit 1
Alarm Value
0.0
M
Lower Limit 3
M
7.sok
Bank 7 Soak Time
1
M
7.wtb
c
Bank 7 Wait Band
off
M

Advertisement

loading

This manual is also suitable for:

E5 n seriesE53-cnbn2E53-cn03n2E53-cnhbn2