Prepare The Site - Kohler Numi+ K-3900T-2-0 Installation Manual

Intelligent toilet

Advertisement

Dock
Power
Cord
Supply Stop
3" (7.6 cm) Max.
When Located
Behind Toilet

Prepare the Site

WARNING: Risk of electric shock. Disconnect power before installation or servicing.
WARNING: Risk of electric shock. Connect only to a properly-grounded, grounding-type receptacle
which is protected by a 220V~, 50Hz,10A or more Ground-Fault Circuit-Interrupter (GFCI) or Residual
Current Device (RCD). Do not remove the grounding pin or use a grounding adapter.
WARNING: Risk of electrical shock. For hardwire installations/through-floor electrical supply:
Connect only to a properly-grounded, dedicated circuit protected by an Class A Ground-Fault
Circuit-Interrupter (GFCI) or Residual Current Device (RCD).
NOTE: Locating the supply stop behind the toilet will make it difficult to remove the back panel.
Install the Dock Power Cord
If the finished wall has not been installed, embed the in-wall cable conduit to route the docking station
power cord. (concealed type)
If the finished wall is installed, use the slot board cable to route the cord to the docking station location.
(out-loading type)
Install the Water Supply
IMPORTANT! When installing the supply hose, connect it to the toilet first, then the supply stop.
NOTE: The supplied water supply hose is 18 " (46 cm) in length. The supplied hose must be used for this
installation.
Install the water supply and supply stop.
Flush the water supply line into a pail or other container to remove all debris.
Kohler Co.
2" (5.1 cm)
8" (20.3 cm)
2-5/8"
(6.7 cm)
1-1/2" (3.8 cm) D.
Water Supply Hole
(for through-the-floor
installations only)
GFCI-
Protected
Receptacle
1-1/4" (3.2 cm) D.
Power Supply Hole
(for through-the-floor
installations only)
1-5/8"
(4.1 cm)
7
6" (15.2 cm)
From Finished Wall
4" (10.2 cm)
Recommended,
11-3/4" (29.8 cm) Min
Floor Flange
Silicone
1195109-T01-F