Download Print this page

Kohler Numi+ K-3900T-2-0 Installation Manual page 18

Intelligent toilet

Advertisement

Install the Back Cover (Optional)
NOTE: Install the cover when the water and power supply are run through the •oor. The cover is not
designed for use when the water or electrical are connected to wall supplies.
Position the cover over the water supply and electrical supply holes.
Run the docking station cord through the slot in the cover. and snap the cover into place on the
supply hose inlet.
Align the spring clip on the cover with the supply hose inlet.
NOTE: The clip will easily snap into place on the supply hose inlet. If there is signi cant resistance, make
sure the clip is not pushing the hose clip out of the way.
Lower the cover and snap the clip into place on the supply hose inlet.
1195109-T01-F
Cover
Slot
Spring
Clip
Docking Station
Cord
Docking
Station Cord
18
Kohler Co.

Advertisement

loading

This manual is also suitable for:

Numi k-3900t-2