Platform Overload System - Terex Genie Z-45/25 DC Service And Repair Manual

Hide thumbs Also See for Genie Z-45/25 DC:
Table of Contents

Advertisement

Service and Repair Manual
Platform Components
6
Move the function enable toggle switch to
either side and hold the platform rotate toggle
switch to the right position until the platform is
fully rotated to the right. Continue holding the
toggle switch until air stops coming out of the
bleed screw. Close the bleed screw.
Crushing hazard. Keep clear of
the platform during rotation.
7
Clean up any oil that may have spilled.
Properly discard the used oil.
8
Rotate the platform fully in both directions and
inspect the bleed screws for leaks.
18
2-3

Platform Overload System

How to Calibrate the Platform
Overload System
Calibration of the platform overload system is
essential to safe machine operation. Continued
use of an improperly calibrated platform overload
system could result in the system failing to sense
an overloaded platform. The stability of the
machine is compromised and it could tip over.
Note: Perform this procedure with the machine on
a firm, level surface.
1
Turn the key switch to ground control and pull
out the red Emergency Stop button to the on
position at both ground and platform controls.
2
From the ground controls, level the platform.
3
Determine the maximum platform capacity.
Refer to the machine serial plate.
4
Remove all weight, tools, accessories and
equipment from the platform.
Note: Failure to remove all weight, tools,
accessories and equipment from the platform will
result in an incorrect calibration.
5
Using a suitable lifting device, place a test
weight equal to the maximum platform
capacity at the center of the platform floor.
Z
®
-45/25 DC
May 2022
Part No. 1268530GT

Advertisement

Table of Contents
loading

This manual is also suitable for:

Genie z-45/25j dc

Table of Contents