Carrier PC211 Start-Up, Operation And Maintenance Instructions Manual page 31

Hermetic centrifugal liquid chillers with hcfc–22 and hfc–134a
Table of Contents

Advertisement

Contents
Figure 13 — LID Default Screen
Figure 14 — LID Service Screen
Figure 15 — Example of Point Status Screen (Status01)
Figure 16 — 19XL Menu Structure
Figure 17 — 19XL Service Menu Structure
Figure 18 — Example of Time Schedule Operation Screen
Figure 19 — Example of Set Point Screen
Figure 20 — 19XL Hot Gas Bypass/Surge Prevention
Figure 21 — 19XL with Default Metric Settings
Figure 22 — Example of Attach to Network Device Screen
Figure 23 — Example of Holiday Period Screen
Figure 24 — Control Sequence
Figure 25 — Typical Wet-Bulb Type Vacuum Indicator
Figure 26 — 19XL Leak Test Procedures

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

19xl

Table of Contents