Carrier PC211 Start-Up, Operation And Maintenance Instructions Manual page 189

Hermetic centrifugal liquid chillers with hcfc–22 and hfc–134a
Table of Contents

Advertisement

Transfer the Refrigerant from Machine to Storage Tank
1. Equalize refrigerant pressure.
a. Valve positions:
1a
Valve
Condition
b. Slowly open valve 5 and liquid line valve 7 to allow liquid refrigerant to drain by gravity
into the storage tank.
1a
Valve
Condition
2. Transfer the remaining liquid.
a. Turn off pumpout condenser water. Place valves in the following positions: