Appendix A: Startup Check List

Before applying power to the TruSense™ RMWH
Refrigerant Monitor, check for all items in the following
table:
Item
Check for
Proper mounting:
Indoors on a rigid surface that does not have vibration or mechanical shock
In a vertical position approximately 5 ft (1.5 m) off the ground
1
Away from direct solar heating or other excessive heat sources, wet or damp conditions where condensation can
occur, areas that are dirty or exposed to oils or chemicals, areas where explosive concentrations of combustible
gases or vapors can occur
Correct electrical connections and wiring:
Correct voltage: 100–240 Vac, 50/60 Hz, 200 VA maximum
2
Through a dedicated circuit breaker
Approved three-conductor wire (minimum 16 AWG), rated 300 Vac at 221°F (105°C)
Conduit hubs and hardware that are suitable for fiberglass enclosures
3
Correct tubing for sample lines
4
End-of-line filters installed in sample lines
5
No end-of-line filter installed in exhaust line
6
All caps and plugs at sample line inlets and exhaust port removed
7
Unused sampling ports are disabled
8
Correct calibration kit and check gases for calibration are available
Proper exhaust venting to one of the following (outside atmosphere preferred):
9
Outside atmosphere, end of exhaust tube protected from debris collection
Safe indoor area away from personnel and refrigerant gases
54
Examiner's
Initials