Power-On Debug Specifications - Fujitsu MB2147-01 Application Note

Emulator system
Table of Contents

Advertisement

1.9

Power-on Debug Specifications

The emulator has a power-on debug function that executes a program immediately
after the evaluation MCU is powered on.
I Power-on Debug Specifications
Power-on debug(*1) is a function using the reset terminal(*2) of the evaluation MCU to verify
execution of a program immediately after the power-on sequence.
Before the power-on debug function can be used, related operations must be completed to
prepare it.
For information on such operations, see the Softune Workbench Operation Manual.
*1 The evaluation MCU must be compatible with the power-on debug function. For more
information, contact the Fujitsu Sales Dept. or Support Dept.
*2 The name of the reset terminal may depend on the model of the evaluation MCU. For
more information, contact the Fujitsu Sales Dept. or Support Dept.
I Operation Flow
Figure 1.9-1 "Power-on Debug Operation Flow" shows the flow of the power-on debug
operation.
Figure 1.9-1 Power-on Debug Operation Flow
- Enable the power-on debug function.
- Set the power-off detection level.
A program is executed.
User system power is turned off.
An evaluation MCU reset is output.
Has the user system
power been turned on?
Has the operation stabilization
time elapsed?
Enable a user system reset.
A program is executed.
1.9 Power-on Debug Specifications
UVCC LED goes off.
UVCC LED goes on.
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mb2198-01

Table of Contents