Power-On Sequence - Fujitsu MB2147-01 Application Note

Emulator system
Table of Contents

Advertisement

3.2

Power-on Sequence

After making all necessary connections, power on the host machine, emulator, and
user system in this sequence.
In the initial state immediately after product shipment, you must initialize the emulator
(monitor program downloading) before powering on the user system.
I Power-on Sequence
CAUTION
Prohibition
After making all the necessary connections, power on the units following the sequence shown in
Figure 3.2-1 "Power-on Sequence".
To power on the emulator, push the power switch located on the back of the emulator (see
Figure 1.2-3 "Emulator Appearance (rear view)"). The switch then remains fixed in the position
where it is pushed in.
In the initial state immediately after product shipment, you must initialize the emulator (monitor
program downloading) before powering on the user system. For the initialization method, see
the Softune Workbench Operation Manual.
Follow the procedure described in the manual to turn on the product.
Doing so may result in device problems.
After power is turned on to the product, do not move the system, or
apply any shock or vibration to it. Doing so may result in device
problems.
3.2 Power-on Sequence
39

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mb2198-01

Table of Contents