Opening The Switch Box - Daikin VAM-J8 Series Manual

Heat reclaim ventilation unit
Hide thumbs Also See for VAM-J8 Series:
Table of Contents

Advertisement

15
|
Electrical installation

15.2 Opening the switch box

Installer and user reference guide
54
Wiring example
a
b
d
OUT
1
L N
L N
1
c
VRV
a Outdoor unit/BS unit
b Switch box
c Indoor unit
d Power supply 220-240 V~50/60 Hz
e Controller for VRV
f Transmission wiring
g Controller for VAM
VRV VRV indoor unit
VAM VAM heat reclaim ventilation unit
WARNING
The VAM and the EKVDX indoor unit MUST share the same electrical safety devices
and power supply.
CAUTION
Before opening the cover, be sure to turn off the power switches of the main units
and other devices connected to the main units.
Remove the screws that secure the cover and open the switch box.
Secure the power supply cable and the control wire with a tie wrap, as shown in
the figures.
2
VRV
VAM
2
1
2
P1 P2 F1 F1 T1 T1
P2 P1
F1 F2
e
VAM
P1
P2
f
f
P1
P2
g
d
L N
JC
J1
J2 J3
L N
f
P1
P2
VAM350~2000J8VEB
Heat reclaim ventilation unit
4P664012-1 – 2021.08

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents