Removal Of Electrical Box - Daikin FT25GV1G6 Service Manual

Removal procedure. 2.5/3.5/4.0 kw class. 9000/12000 btu/h class.
Hide thumbs Also See for FT25GV1G6:
Table of Contents

Advertisement

Removal of Electrical Box

5. Removal of Electrical Box
Procedure
Step
1
The figure shows the
connections of wire
harnesses.
Remove the screw of
2
the wire fixture.
3
Remove the 4 screws
of the terminal board
and disconnect the
connecting wire.
4
Disconnect the
connector for the swing
motor [S6].
10
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Procedure
Drip proof
plate
Preparation
Remove the front grille
Electrical box
according to the "Removal
of Front Grille."
(R10876)
Wire fixture
(R17044)
Terminal
board
Connecting
wire
(R16495)
Put any excess wires behind
the power supply lead wire.
[S6]
(R10879)
Si041048
Points
Removal Procedure

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents