3
|
Components
3.17.7 To install the discharge grille
3.18 Reactor
Service manual
242
4×
3.55 N • m
2
a Speed nut
1 Insert the hooks. To prevent breaking the hooks:
▪ First insert the bottom hooks (2×).
▪ Then insert the top hooks (2×).
2 Insert and fix the screws (4×)(delivered as accessory).
1
2
4×
4 N • m
T25
INFORMATION
Procedures are ONLY for reactors of the single phase outdoor unit.
NO procedures available for reactors of the 3‑phase outdoor unit.
a
2
2
1
2
EBLA09~16DA + EDLA09~16DA
Daikin Altherma 3 M
ESIE20-06A – 2021.03