Step 4. Positioning, Leveling, And Securing The Fireplace; Step 5. The Gas Control System - Heat & Glo PIER-HVB-CE Installer's Manual

Hide thumbs Also See for PIER-HVB-CE:
Table of Contents

Advertisement

Step 4. Positioning, Leveling, and Securing
the Fireplace
The diagram below shows how to properly position, level,
and secure the fireplace.
Figure 27. Proper Positioning, Leveling, and
Securing of a Fireplace
• Place the fireplace into position.
• Level the fireplace from side to side and from front to
back.
• Shim the fireplace with non-combustible material, such
as sheet metal, as necessary.
• Secure the fireplace to the framing by nailing or screw-
ing.
• Holes are provided in the base pan for securing the unit
to the floor.
29
NAILING TABS
(BOTH SIDES)
Heat & Glo • PIER/ST/L&RCOR-HVB-CE • 2068-900 Rev. o • 3/13

Step 5. The Gas Control System

wARNING: THIS UNIT IS NOT FOR USE wITH
!
SOLID FUEL.
Flame Sensor Rod
Figure 28. Gas Control System
Standing Pilot Ignition System
This system includes millivolt control valve, Standing Pilot,
thermopile/thermocouple flame sensor, and piezo ignitor.
wARNING: 230 VAC MUST NEVER BE CON-
!
NECTED TO A CONTROL VALVE IN A MIL-
LIVOLT SySTEM.
Standing Pilot

Advertisement

Table of Contents
loading

This manual is also suitable for:

St-hvb-ceLcor-hvb-ceRcor-hvb-ce

Table of Contents