OPERATION
Pump Test
(user to block the inlet for PASS)
Fig. 3-6 CSM Warm-up
Note: STEL and LTEL alarms not illustrated
Calibration Date Features
At the end of warm-up and before the First Responder CG
is ready for measuring, the instrument will indicate on the
3-7