Download Print this page

Exmark ULTRAVAC BAGGER 126-6954 Setup Instructions page 6

Hide thumbs Also See for ULTRAVAC BAGGER 126-6954:

Advertisement

Figure 9
483 and 523 Decks
1. 3/8-16 x 1 1/4 inch carriage bolt
2. Belt cover bracket
3. 3/8 inch flanged nyloc nut
Figure 10
484 and 524 Decks
1. 3/8-16 x 1 1/4 inch carriage bolt
2. Belt cover bracket
3. 3/8 inch flanged nyloc nut
• 603 and 604 Decks: Use the hardware shown in
Figure 11 and Figure 12. Install the blocker plate
to the outside of the deck using 3/8-16 x 1 1/4
inch carriage bolt and 3/8 inch flanged nyloc nut.
g037341
1. 3/8-16 x 1 inch hex bolt
2. Belt cover bracket
3. 3/8 inch nyloc nut
g037350
1. 3/8-16 x 1 1/4 inch carriage
bolt
2. Belt cover bracket
3. 3/8 inch nyloc nut
Installing the Blower Drive Sheave
1.
Remove the deck drive belt from around the right
hand spindle sheave.
2.
Support the right mower blade and shaft so that it
will not fall out of the deck when the right sheave
nut is removed.
3.
Remove the right sheave nut and sheave from the
spindle shaft.
6
Figure 11
603 Deck
4. Blocker plate
5. 3/8-16 x 1 1/4 carriage bolt
Figure 12
604 Deck
4. Blocker plate
5. 3/8-16 x 1 1/4 carriage bolt
g204818
g037342

Advertisement

loading