3D Reconstruction Upgrade Part 2
Fig. 42: Terminal blocks
Fig. 43: Shielding
•
Secure the shielding and attach it with screws
•
Connect cables 1 through 4 to terminal blocks 1 through 4
(Fig. 46 / p.
Siemens AG
Medical Solutions
43)).
SPR2-320.814.02.01.02
01.05
(Fig. 45 / p.
43).
((Fig. 44 / p. 42)
Page 41 of 46
CS SD 24
41
and
ARCADIS Orbic