NOTE:
Panel Carrier and Pipe Racks cannot be installed simultaneously
if WorkStation is installed, although they are interchangeable.

Safety Precautions

MULTIPLE MATERIAL-HANDLING ACCESSORIES CAN BE INSTALLED BUT ONLY ONE
MAY BE LOADED AT A TIME UNLESS APPROVED BY JLG INDUSTRIES, INC.
THIS ACCESSORY AFFECTS THE OVERALL PLATFORM CAPACITY. REFER TO THE CAPAC-
ITY DECAL AND ADJUST ACCORDINGLY. DO NOT OVERLOAD THE PIPE RACKS.
• Ensure no personnel are beneath the platform.
• Do not exit the platform over the rails, or stand on the rails.
• Do not drive the machine without material secured.
• Return the racks to the stowed position when not in use.

Preparation and Inspection

• Ensure all components are secured to the platform.
• Check for any missing or damaged components. Replace if
necessary.
• Check for loose nuts and bolts. If necessary, torque accord-
ing to the Torque Chart specifications in Section 1 of the
Service Manual.
• Replace missing or illegible decals.
• Replace any torn or frayed straps.
31215942

Operation

1.
To prepare racks for loading, remove work/stow locking pins,
rotate each rack 90 degrees from stowed to working posi-
tion, and secure with the locking pins.
2.
Place material onto racks with weight evenly distributed
between both racks. Do not exceed the rated capacity stated
on the decal.
3.
Route the tie-down straps at each end across loaded mate-
rial and tighten.
4.
To remove material, loosen and remove tie-down straps,
then carefully remove material from racks.
NOTE:
Reinstall tie-down straps across any remaining material before
continuing machine operations.
5.
When not in use, remove locking pins, rotate racks 90
degrees to the stowed position, and reinstall locking pins.