SECTION 3 - MACHINE CONTROLS, INDICATORS AND OPERATION
1
Figure 3-4. Lifting Machine Using Spreader Bar and Lift
Lug Locations
1. Four equal length chains or lifting
straps.
3-24
2
1
2. Spreader Bar Assembly.
Tie Down
When transporting the machine, the platform must be fully lowered in
the stowed position with the machine securely tied down to the truck
or trailer deck. There are two tie-down and one lift lugs located at the
front and two tie-down/lift lugs on the rear of the machine. (See Figure
3-5.)
31215942