Honeywell BC-200 Operation, Installation & Programming Manual page 122

Table of Contents

Advertisement

Appendix
9.6.5.2
NCM S
Channel A & B
connections
Ground Fault
detection switches
and Network End Of
Line Termination
Resistor switches
From last node,
Port A
Note:
Wiring from the NCM-W that is installed outside buildings:
- Must be in conduit and be buried in a trench separate from any power lines
- Cannot cross any power lines
NCM-W Connections:
Connector Pin
TB100-1
TB100-2
TB100-3
TB100-4
TB100-5
BC-200 Manual – P/N DOC-01-013
& T
WITCHES
ERMINATIONS
B
A
Signal Name
CH-A (+)
CH-A (-)
CH-B (+)
CH-B (-)
Earth Ground
Network connection
ports (NUP)
Diagnostic LEDs
B
A
Channel-A Driver / Receiver
Channel-A Driver / Receiver
Channel-B Driver / Receiver
Channel-B Driver / Receiver
Not used
To next node,
Port B
CONNECTION
DETAIL
122

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents