Honeywell BC-200 Operation, Installation & Programming Manual page 72

Table of Contents

Advertisement

Panel Operation
7.3.6.11 S
ERVICE
In this screen a digital output may be tested to verify its ability to operate when required.
DIGITAL OUTPUT TEST MENU
DAY MODE
20 JULY 2002 14:44:37
TESTING DIGITAL OUTPUT POINT
POINT STATUS:
SCRIPT PROCESSING PAUSED
TEST BUTTON WILL TOGGLE STATE
TEST
All script processing is paused while in test mode to provide positive control of the output state. Scripts
automatically recommence processing when test mode is exited.
Test mode will automatically exit after 10 minutes from the last button press to prevent the system remaining
off line.
If a digital output does not have a control script and is set on during test mode, the output will remain on
permanently until turned off through test mode. This can be a useful function for testing purposes during
commissioning.
Note:
As the Dout tests activate the output at the remote module, the module itself is tested as well as the panel to
module communications.
7.3.6.12 S
ERVICE
This function will run a load test on the batteries for 15 seconds, and if a battery fault is detected, it will be
displayed and logged as such to the history. A successful Battery Test will clear a battery fault. The panel also
performs a short battery integrity test every hour.
Note: The battery test will not run if there is a Mains Fail condition, so as not to further deplete the battery charge.
BC-200 Manual – P/N DOC-01-013
M
– T
ENU
EST
A = 0
F = 0
I = 0
N = 1
1.2.O3
OFF
BACK
M
– T
ENU
EST
– D
OUT
Actions:
A single press of the TEST button will toggle the
output between on and off.
Pressing the BACK button will return to the
previous screen.
– B
ATTERY
72

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents