Incoming Inspection - Agilent Technologies E5091A User Manual

Multiport test set
Table of Contents

Advertisement

Installation

Incoming inspection

Incoming inspection
When you receive the product, follow the below steps to perform the incoming inspection.
WARNING
If there are signs of shipping damage to any portion of the outer enclosure when
opening the package (for example, the cover, front/rear panel, power switch, and port
connectors), do not turn on the power. You may get an electrical shock.
Step 1. Check the shipping container and cushioning material for damage.
NOTE
If the shipping container or cushioning material is damaged, it should be kept until the
following other inspections have been done.
Step 2. Check the contents of the package for mechanical damage or defects.
Step 3. Check that the E5091A's option is correct, referring to Figure 1-1.
Step 4. Check the contents of the shipment using Table 1-1 and Figure 1-2 to see if all your
specified options are complete.
Step 5. If you detect any of the following in the inspection, contact you nearest Agilent
Technologies sales office.
1. If the shipping container or cushioning material is damaged or the cushioning material
2. If you find any mechanical damage or defect to the contents.
3. If the contents of the shipment is not complete.
4. If you find any fault on the product during operational checks described below.
In the case of 1, notify the carrier as well as your nearest Agilent Technologies sales office.
Keep the shipping container, cushioning material, and the contents of the shipment for the
carrier's inspection.
10
shows signs of unusual stress.
1

Advertisement

Table of Contents
loading

Table of Contents