Brick And Baffle Installation - Napoleon S25 Installation And Operation Manual

Hide thumbs Also See for S25:
Table of Contents

Advertisement

Available languages

Available languages

finishing
EN
4.3

brick and baffle installation

WARNING
!
Operation of the appliance without the bricks and baffles can result in excessive temperatures that could
damage the appliance, chimney and the surrounding enclosure.
With the appliance and chimney installation
completed, move the bricks into place as
illustrated below (Fig. 4-3).
Install eight "A" bricks and four "B" bricks
A.
along the bottom of the firebox, working
from the back of the appliance forward.
Install eight "A" bricks along the left and
B.
right sides of the appliance.
Install four "A" bricks and two "C" bricks
C.
along the back wall by pivoting the
bricks up under the brick retainer.
note:
Place "C" bricks in the centre, with
two "A" bricks on either side as
illustrated (Fig. 4-3).
Install six "D" bricks along the front of the
D.
firebox.
Carefully pivot four "E" fibre baffles up onto the secondary air tubes as illustrated (Fig. 4-4). Ensure that
E.
the baffles are pushed all the way to the rear of the firebox, leaving a minimum of a 1 inch gap along the
front. This will allow the flue gases to escape the firebox. Ensure overlap joint is tight.
Some parts
hidden for clarity.
note:
The fibre baffles are shipped inside the firebox. They must be removed from all special packaging prior to installation.
For further details about brick descriptions and part numbers, see "replacement parts" section.
22
W415-2837 / 08.11.20
A
A
A
A
D
A
A
D
D
D
D
Baffles (x4)
Secondary Air
Tubes (x4)
E
E
E
E
A
A
C
C
A
A
B
B
A
B
A
B
A
D
A
Overlap
Joint
Fig. 4-4
A
A
A
A
A
A
Fig. 4-3

Advertisement

Table of Contents
loading

Table of Contents