Test Start-Up - Siemens SIMATIC OP7 Manual

Programme for chambers with mplc, by vicpas
Hide thumbs Also See for SIMATIC OP7:
Table of Contents

Advertisement

SHIFT
ENTER
SHIFT
ENTER
SHIFT
ENTER

TEST START-UP

K2
K1
• Press
Water recharge:
Not used:
Not used:
SP. hum. CTRL
1) When it is switched ON, the condensate water is recycled
When it is switched OFF, the condensate water is drained off.
2) Not used
3) Not used
4) When it is switched ON, the humidity slope can be controlled.
If you enter the wrong number, you will still have to press ENTER and then re-digit
the number.
Aux 1:
Aux 2:
Aux 3:
Aux 4:
If you enter the wrong number, you will still have to press ENTER and then re-digit
the number.
Aux 5:
Aux 6:
Aux 7:
Aux 8:
If you enter the wrong number, you will still have to press ENTER and then re-digit
the number.
To switch off (led light switched off)
TO VISUALIZE
• To start the test
• The led light switches on the machine starts up and reaches the set tempera-
ture and humidity values: 20°C, 60% RH and remains in operation along these
values.
Both the set rising and descending values are reached at maximum speed.
Temp. meas.
Humid. meas.
11
In some versions of the programme the
writing in points (1), (2), (3), are
A7
replaced by:
(1)
OFF
Dedicated contact 5
(2)
OFF
Dedicated contact 6
(3)
OFF
Dedicated contact 7
(4)
OFF
A8
When it is switched ON, the ABCD
(1)
OFF
contacts on the DIGITAL IN/OUT
(2)
connector are closed (see attached
OFF
electrical diagram and the descrip-
(3)
OFF
tion of the connector in the cham-
(4)
OFF
ber instruction handbook).
A9
(1)
OFF
(2)
OFF
(3)
OFF
(4)
OFF
Data measured inside the chamber are
.......°C
visualized.
The chamber reaches these values and
.......%
maintains them.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents