Facade And Splashguard; Install Facade - Hussmann Freedom Series Installation & Operation Manual

Hide thumbs Also See for Freedom Series:
Table of Contents

Advertisement

P/N 0520677_W

INSTALL FACADE

Install facades on case lineup using supplied
hardware. Note location(s) of controller box
in facade cutout for the various case lengths.
Attach with brackets and screws.
Notice that facade supports will vary with
the number of doors, or length, of the
merchandiser. Position the facade centered on
case length and flush with the fascia as shown
below.
2-Door Facade
3-Door Facade
Support screwed into top of Case
Vertical Support
Facade screwed into Supports.
Facade screwed into Front Channel.
Evaporation Pan to be located in
this area for 4 & 5-door cases.
Fasten Facade to top of
Case using Self-Drilling
screws (every 2 feet).
HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.

FACADE AND SPLASHGUARD

Vertical Support Guide for different Case lengths (Top View)
Front
Channel screwed
into Top Frame.
Facade
Vertical
Supports
Facade screwed into Front Channel.
Fasten Facade to top of
Case using Self-Drilling
screws (every 2 feet).
4-Door Facade
5-Door Facade
Field Installation 2&3-Door Cases
Field Installation
4 & 5-Door Cases
Channel screwed
into Top Frame.
Vertical Support
Facade screwed into Supports.
Vertical
Supports
Freedom Line Reach-in
3-1

Advertisement

Table of Contents
loading

Table of Contents