Ashrae Color Code; Finishing Touches; Bumper Installation Tips; Installing Splashguard - Hussmann Q1-SSN Installation & Operation Manual

Deli self service case
Table of Contents

Advertisement

Ashrae Color Code

NOTE:
All other manufacturers have no standard sensor codes.
Case Control Systems SENSOR COLOR
Manufacturer ® >
Location
Coil Inlet
Color
Part#
Color
Coil Outlet
Part#
Color
Discharge Air
Part#
Color
Return Air
Part#
Color
Defrost Term.
Part#
Color
Liquid Line
Part#

Bumper Installation Tips

1. Start to attach the bumper at one end of the lineup,
preferably on a straight case.
2. Push the end of the bumper into the bumper
channel firmly. This may be difficult if bumper is cold.
3. Bend the bumper backwards to open and guide it
forward onto the bumper channel.
4. An inside bumper miter must be cut on wedges.
5. Loose ends on miters must be anchored with
screws on the bottom edge.
6. The top and bottom edges of the bumper must be
firmly seated into the retainer by applying with a
rubber mallet (not by hand).
7. The bumper should be struck by the mallet at a
slight angle that forces the bumper back into itself
to prevent stretching. The installation can be made
easier by applying a paraffin block to the retainer
grooves.
Electrical (Cont'd)
EIL
CPC
Blue
Blue
225-01-1755
225-01-3255
Red
Red
225-01-1757
225-01-3123
Green
Green
225-01-1756
225-01-3260
Purple
Green
225-01-1758
225-01-3260
White
Orange
225-01-0650
225-01-3254
White
Blue
225-01-0650
225-01-3255

Finishing Touches

Installing Splashguard

After merchandisers have been leveled and joined, and
all drip piping, electrical and refrigeration work has been
completed, install the splashguards. Splashguards may
be sealed to the floor using a vinyl cove base trim. The
size of trim needed will depend on how much the floor is
out of level.
NOTE:
The splashguard must be removable to allow access to
components behind it.
1. Remove all dirt, wax, debris, etc. from the area of
the splashguard to ensure a secure adhesion.
2. Apply a good contact cement to the trim, allowing a
proper dry time.
3. Install trim to the splashguard so that it is flush with
the floor.
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Q1-ss

Table of Contents