LG MG200 Service Manual page 107

Table of Contents

Advertisement

6. SERVICE AND CALIBRATION
6.2.5 Test JIG Operation
Switch Number
Switch 1
Switch 2
Switch 3
Switch 4
LED Number
LED 1
LED 2
LED 3
LED 4
Operation
a) Connect the RS232 serial cabls between COM port of notebook and MON port of
test JIG in general
b) Set the power supply 4.0V
c) Set the 3rd of DIP SW ON state.
d) Set the 4th of DIP SW ON state.
e) Press the phone power key. If the remote power on is used, switch the 1st of DIP
SWITCH ON.
JIG Power
Equipment
Power Supply
DC Adaptor
JIG DIP Switch
Name
ADI_REMOTE
In On state phone is awaked. Not used - OFF state
TI_REMOTE
In On state phone is awaked.
VBAT
Power is provided for phone from Power supply
PS
Power is provided for phone from DC adaptor
JIG LED
Name
POWER
Power is provided for test JIG
TA
Indicate charging state of the phone battery
with travel charger
Indicate date transfer state through the UART IrDA
MON STATUS
UART STATUS
Indicate date transfer state through the UART MODEM
- 106 -
Description
Usually 4.0V
9.5V, 500mA
Description
Description

Advertisement

Table of Contents
loading

Table of Contents