Table Of Contents - Trane CLCF Climate Changer Manual

Air handling units
Table of Contents

Advertisement

Table of Contents

General information .......................................................................................... 4
Foreword ................................................................................................... 4
Warnings and cautions ............................................................................ 4
FWD
Important recommendations .................................................................. 4
Capacities
Cooling capacity on water (1)
Heating capacity on water (2)
Reception .................................................................................................. 5
Fan motor
Fan power input (3)
Warranty .................................................................................................... 5
Current amps (3)
Start-up amps
Air flow
Maintenance contract............................................................................... 7
minimum
Training .................................................................................................... 7
maximum
Main coil
Water entering/leaving connections
Installation .......................................................................................................... 8
Off loading and handling ......................................................................... 8
Heating capacity
Storage ...................................................................................................... 9
G2 filter (filter box accessory)
Quantity
Unit assembly ........................................................................................... 9
Dimensions ( LxWxth)
G4 filter (filter box accessory)
Foundation and positioning .................................................................. 12
Duct connection ...................................................................................... 14
Electrical connection .............................................................................. 14
Sound level (L/M/H speed)
Sound power level (5)
Motor connection ................................................................................... 15
Unit dimensions
Frostat frame access .............................................................................. 17
Shipped unit dimensions
Width x Depth
Pipe connections to coil ......................................................................... 17
Height
Water connections .................................................................................. 19
Colour
Unit alone (aM/gI)
Commissioning procedure ............................................................................. 22
Unit with electric heater (gI)
Pre-start checklist .................................................................................... 22
(1) Conditions: Water entering/leaving temperature: 7/12 °C, Air inlet temperature 27/19°C DB/WB - Nominal air flow
(2) Conditions: Water entering/leaving temperature: 50/45 °C, Air inlet temperature 20°C DB - Nominal air flow
(3) At high speed with nominal air flow.
Start-up .................................................................................................... 25
(4) Water entering/leaving temperature 90/70 °C, air inlet temperature 20 °C DB, Nominal air flow.
(5) A rectangular glass wool duct 1m50 long is placed on the blower.The measurement is taken in the room containing the blower unit.
Evaporative Humidifiers/air washers .................................................... 25
Heat exchanger operating limits:
*water temperature: max 100° C
Factory engineered controls ........................................................................... 27
*absolute service pressure: min 1 bar/max 11 bars
Accessories - Hot water coil:
System controller options ..................................................................... 27
*water temperature: min. +2° C/max. 100° C
*absolute service pressure: min 1 bar/max 11 bars
Shipping .................................................................................................. 27
Installation .............................................................................................. 27
Loose control items ................................................................................ 27
Mains connection ................................................................................... 28
Reconnection of sectionalized units .................................................... 28
Wiring requirements .............................................................................. 28
2
4
Technical Data
08
(kW)
5,2
(kW)
6,3
(type)
(kW)
0,23
(A)
1,1
(A)
3,2
(m
/h)
490
3
/h)
820
3
(m
/h)
980
3
(type)
(Dia)
3/4"
230/1/50
(kW)
2/4
(kW)
6,3
2
-
(mm)
-
(l/h - mm)
(dB(A))
36/40/43
(dB(A))
46/50/53
890 x 600
(mm)
250
(mm)
933 x 644
(mm)
260
32
(A)
8/16
16 (2kW),25 (4kW)
12
20
230/1/50
8,3
15
11,9
18,9
2 x direct drive centrifugal
0,46
0,65
2,2
3,1
5,5
9,3
980
1400
1650
2300
1970
2600
ISO R7 rotating female
3/4"
1 1/2"
230/1/50 or 400/3/50
400/3/50
8
10
12
17,4
2
2
2
2
486x264x48
586x314x48
24 - 500
38/41/44
46/50/53
48/51/54
56/60/63
1090 x 710
1290 x 820
300
350
1133 x 754
1333 x 864
310
360
46
61
galvanised steel
8/16
8/16
3*20
30
45
18,8
30,1
20,9
38,2
1,04
1,51
4,7
5,5
14,1
16,5
1800
2700
3000
4500
3600
5400
1 1/2"
1 1/2"
400/3/50
400/3/50
12
12
22,4
34,5
2
2
586*421*8
586*621*8
2
2
586*414*48
586*614*48
47/52/57
47/52/58
57/62/67
57/62/68
1290 x 970
1290 x 1090
450
650
1333 x 1008
1333*1133
460
660
76
118
8/25
8/25
3*25
3*25
UNT-PRC002-GB
AH-SVX03C-GB

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents