Air handling units
Table of Contents

Advertisement

Vibration isolators
Check that vibration isolators are free to operate and that there is no contact existing between the fan/motor
chassis and the support.
Frequency inverter
Sound power levels
1.
The VFD must be compatible with HVAC applications, such as fans with quadratic torque.
2.
The electric power output of the VFD shall be compatible with the nominal power of the motor.
Discharge
3.
The VFD shall be compatible with its environment (IP rate, type of ventilation, ambient temperature,
electromagnetic environment...)
Measurement conditions:
4.
All recommendations indicated in the Installation/Operation/Maintenance manual of the VFD manufacturer must
Measurements taken in a room adjacent to the room containing the FWD, at the outlet of the rectangular duct (1.5 m
be respected.
long) fixed to its discharge opening.
5.
The VFD comes with default values which may have to be fine- tuned during commissioning.
Fan
CAUTION!
Unit
speed
In some cases, mechanical issues my affect the fan or motor, and may be caused by the inverter settings (vibration,
1
FWD 08
2
excessive noise, lower efficiencies, motor overheating...). If the inverter is removed and the mechanical issues do
3
not persist, the inverter settings must be reconfigured. Inverter settings to verify can include: attenuated resonance,
1
quadratic torque, frequency regulation, etc.
FWD 10
2
3
Unit connections
1
FWD 12
2
All electrical, water, and duct work connections of the unit must be completed by a qualified person.
3
Check that electrical connections comply with the wiring diagram and that the thermal protection is operational.
1
FWD 14
2
Completely stress-free connections are essential.
3
The pipe work of the coils should be arranged to facilitate easy removal of the coil for maintenance purposes.
1
FWD 20
2
Coils
3
Check that the coil connections and valves are not leaking. If there are leaks, rectify the problem.
Intake
Cooling coil sections are fitted with condensate drains. Check that these are properly fitted to allow draining and
avoid air suction and water carry-over.
Measurement conditions:
Water coil filling
Measurements taken at the horizontal air intake.
In general, heating and cooling coils are filled with water and standard additives to protect against freezing and
corrosion:
Fan
Unit
speed
• open the air vent
1
• slightly open the water supply valve so that the heater battery fills slowly. This avoids thermal stress
FWD 08
2
3
• as soon as the heater coil is full, close the air vent
1
• open the water valve fully and switch on the fan
FWD 10
2
• finally, the entire piping system must be completely vented.
3
1
Steam coil filling
FWD 12
2
• Open gradually the air vent and drain valve on the condensate drain
3
1
• Slightly open the steam valve until steam penetrates through the condensate drain valve and air vent
FWD 14
2
• Close the condensate drain valve and air vent and open the steam valve fully
3
• Vent regularly during operations
1
FWD 20
2
CAUTION! If the installation is switched off temporarily, condensate must not be stopped temporarily to remain in
3
the pipes to avoid freezing and corrosion risk.
For steam, overheated, high temperature coils, to prevent overheating inside the unit, the fan stop must be delayed
by 3 to 5 minutes after the steam valve have been closed.
Electrical heaters
Electric air heaters are provided with automatic and/or manual reset overheat thermostats.
CAUTION! To prevent over heating inside the unit when the heater is being switched off, the fan maybe switched off
after an over run period of 3 to 5 minutes.
The same shall be done when the unit is installed any other type of high temperature source.
AH-SVX03C-GB
UNT-PRC002-GB
Power level in dB(A), per Hz frequency band
125
250
500
55
50
42
57
54
47
58
57
50
57
51
45
58
54
48
60
58
50
57
51
45
58
54
48
60
58
50
56
62
50
61
66
55
63
69
58
57
63
51
61
66
55
63
69
58
Power level in dB(A), per Hz frequency band
125
250
500
56
55
55
63
62
60
66
65
63
62
58
55
66
63
60
70
67
63
62
58
55
66
63
60
70
67
63
66
65
65
73
72
69
78
76
73
68
72
64
76
76
68
78
79
71
Commissioning procedure
1000
2000
4000
37
37
31
40
30
38
42
32
40
42
34
33
45
38
39
48
40
42
42
34
33
45
38
39
48
40
42
48
39
38
53
47
46
56
50
50
49
40
39
53
47
46
56
50
50
1000
2000
4000
53
46
45
60
53
53
62
56
55
58
51
48
62
56
55
65
59
59
58
51
48
62
56
55
65
59
59
65
57
50
71
64
59
75
69
64
64
56
52
71
65
61
74
69
66
Overall power
8000
dB(A)
30
46
40
50
43
53
28
48
35
51
39
54
28
48
35
51
39
54
36
56
45
60
49
63
37
57
45
60
49
63
Overall power
8000
dB(A)
42
57
53
64
57
67
44
61
52
66
57
69
44
61
52
66
57
69
46
68
57
74
63
78
50
69
61
75
66
78
11
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents