Commissioning Procedure; (A) 40 (230V),3*16 (400V); Pre-Start Checklist - Trane CLCF Climate Changer Manual

Air handling units
Table of Contents

Advertisement

Commissioning procedure

Figure 18
FWD
Power supply
Capacities
Cooling capacity on water (1)
Heating capacity on water (2)
Fan motor
Fan power input (3)
Current amps (3)
Start-up amps
Figure 19
Air flow
minimum
nominal
maximum
Main coil
Water entering/leaving connections
Electric heater (accessory for blower only)
Electric power supply
Heating capacity
Hot water coil (accessory for blower only)
Heating capacity (4)
G2 filter (filter box accessory)
Quantity
Dimensions ( LxWxth)

Pre-start checklist

G4 filter (filter box accessory)
Quantity
Dimensions ( LxWxth)
Initially the complete unit and all components should be thoroughly cleaned and all dust and other deposits
Condensate pump (accessory)
completely removed.
Water flow - lift height
Not available for FWD30 and FWD45
The unit must be maintained in a clean condition.
Sound level (L/M/H speed)
Prior to dispatch, each unit is thoroughly checked. Nevertheless, as part of the commissioning procedure, it is
Sound pressure level (5)
Sound power level (5)
imperative to recheck certain items as listed below.
Unit dimensions
Check that there are no foreign bodies in the unit or in the duct system and that air inlet sand outlets are not
Width x Depth
blocked.
Height
Shipped unit dimensions
Some of the settings on the unit may have changed during transportation and installation process.
Width x Depth
Height
Make sure all bolts and screws are tightened, especially moving parts such as fan pulleys, bearings etc.
Weight
Make sure electrical connections are tightened.
Colour
Recommended fuse size
For units with variable air volume devices, check that dampers are fully open.
Unit alone (aM/gI)
Unit with electric heater (gI)
Make sure that the dampers move freely in their correct positions and that they operate correctly.
If the unit is provided with a cross flow heat recovery exchanger, it is designed to resist at the nominal
(1) Conditions: Water entering/leaving temperature: 7/12 °C, Air inlet temperature 27/19°C DB/WB - Nominal air flow
(2) Conditions: Water entering/leaving temperature: 50/45 °C, Air inlet temperature 20°C DB - Nominal air flow
differential pressure indicated on the technical sheet, so all dampers and interception devices must be opened.
(3) At high speed with nominal air flow.
(4) Water entering/leaving temperature 90/70 °C, air inlet temperature 20 °C DB, Nominal air flow.
This action should be interlocked to the control system.
(5) A rectangular glass wool duct 1m50 long is placed on the blower.The measurement is taken in the room containing the blower unit.
Fan motor
Heat exchanger operating limits:
Check that the fan revolves freely by turning the impeller manually and verify that no foreign bodies are lodged
FWD:
*water temperature: max 100° C
in the fan scroll.
*absolute service pressure: min 1 bar/max 11 bars
Remove the locking block under the motor-fan base frame.
Accessories - Hot water coil:
*water temperature: min. +2° C/max. 100° C
Check that the fixing screws on the belt pulleys are tight (see Figures 18 and 19).
*absolute service pressure: min 1 bar/max 11 bars
Check the fan belt tension and pulleys alignment. Realign and retighten if necessary (See Maintenance section).
Make sure that the dampers move freely and that any transport packing has been removed.
Check the motor connections and make sure that the correct voltage supply is being used. Verify the lubrication
of fan and motor bearings (See Maintenance section and follow the motor manufacturer's recommendations).
Bearings could be pre-lubricated. Start-up may be noisy until grease is evenly distributed. Please refer to the
individual supplier's installation, operation, and maintenance manuals for additional information.
If adjustable pulleys have been fitted, ensure they are positioned in the correct ratio. The setting is done at the
factory and should not require further adjustment. If adjustment must be made, refer to the section about pulleys
in this manual.
Fan must not work with interception device closed, like dampers, in order to avoid permanent deformation of the
structure. Dampers must be open during fan operation. Trane cannot be held responsible of structural damages
due to that.
22
4
Technical Data
08
(V/Ph/Hz)
(kW)
5,2
(kW)
6,3
(type)
(kW)
0,23
(A)
1,1
(A)
3,2
(m
/h)
490
3
(m
/h)
820
3
(m
/h)
980
3
(type)
(Dia)
3/4"
(V/Ph/Hz)
230/1/50
(kW)
2/4
(kW)
6,3
2
(mm)
386x221x8
-
(mm)
-
(type)
(l/h - mm)
(dB(A))
36/40/43
(dB(A))
46/50/53
(mm)
890 x 600
(mm)
250
(mm)
933 x 644
(mm)
260
(kg)
32
(A)
8/16
(A)
16 (2kW),25 (4kW)
12
20
230/1/50
8,3
15
11,9
18,9
2 x direct drive centrifugal
0,46
0,65
2,2
3,1
5,5
9,3
980
1400
1650
2300
1970
2600
ISO R7 rotating female
3/4"
1 1/2"
230/1/50 or 400/3/50
400/3/50
8
10
12
17,4
2
2
486x271x8
586x321x8
2
2
486x264x48
586x314x48
Centrifugal
24 - 500
38/41/44
46/50/53
48/51/54
56/60/63
1090 x 710
1290 x 820
300
350
1133 x 754
1333 x 864
310
360
46
61
galvanised steel
8/16
8/16
40 (230V),3*16 (400V)
3*20
30
45
18,8
30,1
20,9
38,2
1,04
1,51
4,7
5,5
14,1
16,5
1800
2700
3000
4500
3600
5400
1 1/2"
1 1/2"
400/3/50
400/3/50
12
12
22,4
34,5
2
2
586*421*8
586*621*8
2
2
586*414*48
586*614*48
47/52/57
47/52/58
57/62/67
57/62/68
1290 x 970
1290 x 1090
450
650
1333 x 1008
1333*1133
460
660
76
118
8/25
8/25
3*25
3*25
UNT-PRC002-GB
AH-SVX03C-GB

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents