Removal Of Electrical Box - Daikin 3MWKS30KV1S Service Manual Removal Procedure

80 kw class, 30000 btu/h class
Table of Contents

Advertisement

Si121177
1.3

Removal of Electrical Box

Procedure
Step
Disconnect the
1
connector [S70].
Release the fan motor
2
lead wire from the 5
hooks.
Disconnect the
3
connectors for the
electronic expansion
valve coils [S20], [S21],
[S22].
Pull out the clamp.
Removal Procedure
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Procedure
[S20] [S21] [S22]
Clamp
[S70]
(R13662)
Fan motor
lead wire
(R13663)
(R15741)
Outdoor Unit
Points
[S70]: fan motor
: When reassembling, do not
use these 2 hooks.
[S20] (white): room A
[S21] (red) : room B
[S22] (blue) : room C
When reassembling, insert
the clamps into the small
holes as below.
Electronic expansion
valve coils
Gas pipe thermistors
Overload protector
and high pressure
Thermistor
switch
ASSY
(R13762)
17

Advertisement

Table of Contents
loading

Table of Contents