Briggs & Stratton Fortress 10kW Installation And Operation Manua page 44

10kw single phase air-cooled standby generator system
Hide thumbs Also See for Fortress 10kW:
Table of Contents

Advertisement

Available languages

Available languages

To remove roof:
1. Remove the five screws (A) that secure the roof to the
unit.
2. Carefully lift and remove roof from unit.
To remove front panel:
1. Remove the two screws (B) that secure the panel to the
unit.
2. Lift and flex panel outward and off base. Use caution
not to damage the battery box (C).
To secure front panel:
1. Place panel in unit.
2. Secure the panel with two screws.
44
A
B
A
A
C

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents