To reduce the risk of skin injection and shock, shut
down the XP Sprayer before installing your XP
PressureTrak. Follow the Shutdown
Relief procedures in the XP Sprayer operation
Relief
Relief
manual.
The procedures in this section are specific to each
component of the XP PressureTrak. For sprayer
installation instructions, refer to the sprayer operation
manual.
1. Perform Pressure
Pressure
Pressure Relief
Relief Procedure
Relief
XP Operations sprayer manual 3A0420.
2. Remove the existing NXT air motor cover and
front (D) of the motor cover.
3. Remove the insert from the solenoid hole (F).
4. Install the solenoid (XE). Use the retainer (G) and
two bolts (H) to secure the solenoid.
NOTE: The holes in the casting may not have
NOTE:
NOTE:
threads, but the screws are thread-forming.
3A3320D
with NXT
NXT Motor
Motor
with
NXT
Motor
Shutdown and Pressure
Pressure
Shutdown
Pressure
Procedure. See your
Procedure
5. Pass the pressure sensor (4a and 4b) through
slot (K) and the solenoid (XE) through slot (J) in
the housing (XB) and secure the housing to the
air motor with two bolts (6).
6. Reinstall the front (D) and install the XP
PressureTrak cover (3).
7. Connect the pressure sensor cables to the
connectors on the circuit board. NOTE:
to match the color codes (connect the blue cord
to J6, circuit board labeled A and green cord to
J7, circuit board labeled B). Connect the solenoid
to J3, then connect the battery to the battery
terminals.
8. Slide the module (XA) into the channel of the
housing (XB) and secure with two screws (5).
9. Insert o-ring (11) on pressure sensor (XD).
Lubricate o-ring and install into the A side (blue)
of the manifold. Torque sensor nut to 40–50
in-lb (54–67 N•m). Insert o-ring (11) on pressure
sensor (XD). Lubricate o-ring and install into the
B side (green) of the manifold. Torque sensor
nut to 40–50 in-lb (54–67 N•m).
10. Install the pressure sensor harness (XD) through
clamp (10) and secure to the frame with screw
(8) and nut (9).
Installation
NOTE: Be sure
NOTE:
9