16 Before You Begin
Attach the rubber feet at the marked locations.
Set the switch on a table or shelf.
Allow at least 2 inches (5.1 cm) on each side for proper ventilation and at least 5
inches (12.7 cm) at the back for power cord clearance.
Installing the switch in an equipment rack
Required tool: Phillips screwdriver for attaching brackets to the switch.
Rack requirements:
•
Regulatory Information for the Nortel Ethernet Routing Switch 2500 Series
Copyright © 2007, Nortel Networks
.
A space of 2.8 inches for each switch in an EIA or IEC standard 19 inch
(48.2 centimeter) equipment rack.
Nortel Ethernet Routing Switch 2500 Series
NN47215-100 (323169-B) 02.01 Standard
4.1 19 November 2007
ATTENTION