Swann AMI Deltacon Power Operator's Manual page 40

Monitoring system
Table of Contents

Advertisement

AMI Deltacon Power
Maintenance
with pre-rinse
option
40
7 Navigate to menu <Maintenance>, <Change of Resin>, press
[Enter] and set it to <Yes>.
8 Open and adjust the sample flow.
9 Pre-rinse the new cation exchanger resin until the display shows
stable measuring values.
Step 1 to 3 same procedure as in "without pre-rinse option":
4 Unscrew and carefully remove the pre-rinsed cation exchanger
bottle [D] from the pre-rinse holder [C].
5 Carefully, without spilling water, push the cation exchanger bottle
[D] over the inlet filter holder [E] into the bottle holder [B].
6 Screw the cation exchanger bottle into the bottle holder.
Do not tighten the bottle too firmly, this could damage the
gasket.
7 Install a new bottle with fresh, unused resin into the pre-rinse bot-
tle holder [C].
 The new c.ation exchanger resin will be pre-rinsed and ready
for use if the next exchange is necessary.
A
Flow cell
B
Bottle holder
A
C
Pre-rinse bottle holder
D
Pre-rinsed cation
exchanger bottle
B
E
Inlet filter holder
C
F
Exhausted cation
D
exchanger bottle
E
F
A-96.250.451 / 190121

Advertisement

Table of Contents
loading

Table of Contents