Power-Up Testing; Self-Test - ADTRAN 1202076L1 User Manual

Aadtran, inc.dtran, inc. user manual cordless telephone 1202076l1, 1202076l1#dc, 1202076l2, 1202076l2#dc
Table of Contents

Advertisement

Slots 3-5
Slot 6
You can use NxDBU modules in any slot.

Power-up Testing

When shipped from the factory, the TSU 600 is set to factory default con-
ditions. At the first application of power, the unit automatically exe-
cutes a memory self-test. A full self-test can be run from the front panel,
and a passcode and unit ID may be set using the UTIL menu.

Self-Test

Upon a power-up, the LCD displays
Test LEDs are illuminated.
When . . .
the self-test is complete
with no failures detected
a failure is detected
61202076L1-1
Slots 3-5 will accept any interface type except second-
ary interface, the interface for DTE timing, or the mul-
tiport DBU. If other interfaces have any restriction on
their location, this will be specified in the individual
option card manual (provided with the option cards).
Slot 6 services any option module type including sec-
ondary network interface ports (DSX-1 (PBX) and Full
D&I), but not the DTE timing source. If a secondary
network interface port is to be used, it must be
installed in slot 6.
Memory Test Now Testing
the
OK LED
momentarily displays
Passed
.
a list of failures is displayed in the
LCD window
TSU 600 User Manual
Chapter 2. Installation
Then . . .
lights up and the LCD
All Tests
and the
2-11

Advertisement

Table of Contents
loading

This manual is also suitable for:

1202076l2Tsu 600Tsu 600e

Table of Contents