Start, Cutting Unit and High Temp. Relays
To test the relay, disconnect the relay wire connector
and install a continuity tester between the relay termi
nals (terminals 30 and 87). The relay should make and
break continuity at terminals 30 and 87 as 12 V.D.C. is
connected and disconnected to terminal 85 with termi
nal 86 connected to ground.
Testing
1
1
1. Cutting unit relay
Page 5 - 20
Figure 15
1. Start relay
2
Figure 16
2. High temp. relay
Figure 17
Reelmaster
®
335-D