W W A A R R N N I I N N G G
C C o o m m b b u u s s t t i i b b l l e e M M a a t t e e r r i i a a l l ! !
F F a a i i l l u u r r e e t t o o f f o o l l l l o o w w i i n n s s t t r r u u c c t t i i o o n n s s b b e e l l o o w w c c o o u u l l d d r r e e s s u u l l t t i i n n
d d e e a a t t h h o o r r s s e e r r i i o o u u s s i i n n j j u u r r y y o o r r e e q q u u i i p p m m e e n n t t d d a a m m a a g g e e . .
S S h h r r i i n n k k - - w w r r a a p p i i s s a a c c o o m m b b u u s s t t i i b b l l e e m m a a t t e e r r i i a a l l . . A A v v o o i i d d o o p p e e n n
f f l l a a m m e e s s a a n n d d h h o o t t s s p p a a r r k k s s . .
Trane Supplied
Type of Requirement
Trane Installed
Foundation
Rigging
•
Disassembly/Reassembly
(as required)
Isolation
•
•
Electrical
•
CDHF-SVX01N-EN
Trane Supplied
Field Installed
Trane will perform or have
direct on-site supervision
of the disassembly and
reassembly work (contact
your local Trane office for
pricing)
•
•
•
•
Circuit breakers or fusible
disconnects (optional)
Unit-mounted starter
(optional)
Power factor correction
capacitors (PFCCs)
(optional)
•
N N o o t t e e : : The chiller should remain within its protective
shrink-wrap covering during storage.
Field Supplied
Field Installed
•
Meet foundation requirements
•
Safety chains
•
Rigging shackles
•
Lifting beam
•
Isolation pads or spring isolators
•
Optional spring isolators, when required, are
Isolation pads or spring
installed by others; do NOT overload springs and do
isolators
NOT install isolation springs if they block serviceable
parts such as the oil tank system, service valves,
etc.
•
Circuit breakers or fusible disconnects (optional)
•
Electrical connections to unit-mounted starter
(optional)
•
Electrical connections to remote-mounted starter
(optional)
•
Wiring sizes per submittal and National Electric Code
(NEC)
Jumper bars
•
PFCCs (remote mounted starter optional only)
Temperature sensor
•
Terminal lugs
(optional outdoor air)
•
Ground connection(s)
Flow switches (may be
field supplied); for
•
Jumper bars
installation instructions
•
BAS wiring (optional)
for the ifm efector®
flow detection controller
•
Inter-processor communication (IPC) wiring (AFD
and sensor, refer to
and remote-mounted starters only)
"Water Flow Detection
•
Control voltage wiring (AFD and remote-mounted
Controller and
starters only)
Sensor," p. 25
or Trane
literature that shipped
•
Oil pump interlock wiring (AFD and remote mounted
with the device
starters only)
Remote-mounted
•
High condenser pressure interlock wiring (AFD and
starter (optional)
remote-mounted starters only)
•
Chilled water pump contactor and wiring including
interlock
•
Condenser water pump contactor and wiring
including interlock
•
Option relays and wiring
•
Tracer® SC communication wiring (optional)
P P r r e e - - I I n n s s t t a a l l l l a a t t i i o o n n
11