P P r r e e - - I I n n s s t t a a l l l l a a t t i i o o n n
Trane Supplied
Type of Requirement
Trane Installed
Water piping
Relief
Insulation
Flanged (optional)
Water Piping Connection
Components
Other Materials
"Appendix B: CenTraVac™
Chiller Installation
Completion and Request
for Trane Service," p. 96
(CTV-ADF001*-EN; refer
to
"Appendix A: Forms and
Check Sheets," p.
95)
Chiller start-up
commissioning
(a)
Post-commissioning
transport of empty
refrigerant containers for
return or recycling
(a)
Start-up must be performed by Trane or an agent of Trane specifically authorized to perform start-up and warranty of Trane® products. Contractor shall
provide Trane (or an agent of Trane specifically authorized to perform start-up) with notice of the scheduled start-up at least two weeks prior to the
scheduled start-up.

Storage Requirements

N N o o t t e e : : If the chiller is stored outdoors for any amount of
time, d d o o N N O O T T r r e e m m o o v v e e A A N N Y Y s s h h i i p p p p i i n n g g
c c o o v v e e r r i i n n g g s s . . P P r r o o t t e e c c t t t t h h e e c c h h i i l l l l e e r r f f r r o o m m t t h h e e
e e l l e e m m e e n n t t s s a a n n d d p p r r o o t t e e c c t t a a g g a a i i n n s s t t f f r r e e e e z z i i n n g g , ,
especially if any shipping materials have been
removed.
12
Trane Supplied
Field Installed
Rupture disk assembly
Insulation (optional)
Flanged (optional)
Welded on flange for
300 psig (2068.4 kPaG)
waterboxes
Trane, or an agent of
Trane specifically
authorized to perform
start-up of Trane®
products
Field Supplied
Field Installed
Taps for flow sensing devices
Taps for thermometers and gauges
Thermometers
Strainers (as required)
Flow sensing devices
Water flow pressure gauges
(may be field supplied)
Isolation and balancing valves in water piping
Vents and drain on waterbox valves (one each per
pass)
Pressure relief valves (for waterboxes as required)
RuptureGuard™
(optional); refer to
Installation, Operation,
Vent line and flexible connector and vent line from
and Maintenance:
rupture disk to atmosphere
RuptureGuard Pressure
Relief System Option
(CTV-SVX06*-EN)
Insulation
Chiller feet insulation
Victaulic®
Victaulic® to flange
Victaulic® coupling for 150 psig (1034.2 kPaG) and
adapter for 150 psig
300 psig (2068.4 kPaG) waterboxes
(1034.2 kPaG)
Fasteners for flanged-type connections (optional)
waterboxes
Trace gas (1 lb [0.45 kg] maximum per machine as
needed to perform leak testing)
Material and equipment to perform leak testing
Dry nitrogen (8 psig [55.2 kPaG] maximum per
machine as needed)
To be completed by installing contractor prior to
contacting Trane for start-up
Move empty refrigerant containers to an easily
accessible point of loading
E E q q u u i i p p m m e e n n t t D D a a m m a a g g e e ! !
F F a a i i l l u u r r e e t t o o p p r r o o t t e e c c t t t t h h e e u u n n i i t t f f r r o o m m f f r r e e e e z z i i n n g g c c o o u u l l d d
r r e e s s u u l l t t i i n n e e q q u u i i p p m m e e n n t t d d a a m m a a g g e e . .
I I f f f f l l u u i i d d h h a a s s b b e e e e n n a a d d d d e e d d t t o o t t h h e e p p i i p p i i n n g g , , t t h h e e u u n n i i t t m m u u s s t t
b b e e p p r r o o t t e e c c t t e e d d f f r r o o m m f f r r e e e e z z i i n n g g . . F F r r e e e e z z e e d d a a m m a a g g e e f f r r o o m m
a a n n u u n n h h e e a a t t e e d d e e q q u u i i p p m m e e n n t t r r o o o o m m i i s s n n o o t t t t h h e e T T r r a a n n e e
c c o o m m p p a a n n y y ' ' s s r r e e s s p p o o n n s s i i b b i i l l i i t t y y . . T T h h e e s s e e a a r r e e i i n n d d o o o o r r u u n n i i t t s s . .
N N O O T T I I C C E E
CDHF-SVX01N-EN