P P r r e e - - I I n n s s t t a a l l l l a a t t i i o o n n
Trane Supplied
Type of Requirement
Trane Installed
Water piping
Relief
•
Insulation
•
Flanged (optional)
Water Piping Connection
•
Components
Other Materials
"Appendix B: CenTraVac™
Chiller Installation
Completion and Request
for Trane Service," p. 96
(CTV-ADF001*-EN; refer
to
"Appendix A: Forms and
Check Sheets," p.
95)
•
Chiller start-up
commissioning
(a)
Post-commissioning
transport of empty
refrigerant containers for
return or recycling
(a)
Start-up must be performed by Trane or an agent of Trane specifically authorized to perform start-up and warranty of Trane® products. Contractor shall
provide Trane (or an agent of Trane specifically authorized to perform start-up) with notice of the scheduled start-up at least two weeks prior to the
scheduled start-up.
Storage Requirements
N N o o t t e e : : If the chiller is stored outdoors for any amount of
time, d d o o N N O O T T r r e e m m o o v v e e A A N N Y Y s s h h i i p p p p i i n n g g
c c o o v v e e r r i i n n g g s s . . P P r r o o t t e e c c t t t t h h e e c c h h i i l l l l e e r r f f r r o o m m t t h h e e
e e l l e e m m e e n n t t s s a a n n d d p p r r o o t t e e c c t t a a g g a a i i n n s s t t f f r r e e e e z z i i n n g g , ,
especially if any shipping materials have been
removed.
12
Trane Supplied
Field Installed
•
•
Rupture disk assembly
Insulation (optional)
Flanged (optional)
•
Welded on flange for
300 psig (2068.4 kPaG)
waterboxes
Trane, or an agent of
Trane specifically
authorized to perform
start-up of Trane®
products
Field Supplied
Field Installed
•
Taps for flow sensing devices
•
Taps for thermometers and gauges
•
Thermometers
•
Strainers (as required)
Flow sensing devices
•
Water flow pressure gauges
(may be field supplied)
•
Isolation and balancing valves in water piping
•
Vents and drain on waterbox valves (one each per
pass)
•
Pressure relief valves (for waterboxes as required)
RuptureGuard™
(optional); refer to
Installation, Operation,
•
Vent line and flexible connector and vent line from
and Maintenance:
rupture disk to atmosphere
RuptureGuard Pressure
Relief System Option
(CTV-SVX06*-EN)
•
Insulation
•
Chiller feet insulation
Victaulic®
Victaulic® to flange
•
Victaulic® coupling for 150 psig (1034.2 kPaG) and
adapter for 150 psig
300 psig (2068.4 kPaG) waterboxes
(1034.2 kPaG)
•
Fasteners for flanged-type connections (optional)
waterboxes
•
Trace gas (1 lb [0.45 kg] maximum per machine as
needed to perform leak testing)
•
Material and equipment to perform leak testing
•
Dry nitrogen (8 psig [55.2 kPaG] maximum per
machine as needed)
•
To be completed by installing contractor prior to
contacting Trane for start-up
•
Move empty refrigerant containers to an easily
accessible point of loading
E E q q u u i i p p m m e e n n t t D D a a m m a a g g e e ! !
F F a a i i l l u u r r e e t t o o p p r r o o t t e e c c t t t t h h e e u u n n i i t t f f r r o o m m f f r r e e e e z z i i n n g g c c o o u u l l d d
r r e e s s u u l l t t i i n n e e q q u u i i p p m m e e n n t t d d a a m m a a g g e e . .
I I f f f f l l u u i i d d h h a a s s b b e e e e n n a a d d d d e e d d t t o o t t h h e e p p i i p p i i n n g g , , t t h h e e u u n n i i t t m m u u s s t t
b b e e p p r r o o t t e e c c t t e e d d f f r r o o m m f f r r e e e e z z i i n n g g . . F F r r e e e e z z e e d d a a m m a a g g e e f f r r o o m m
a a n n u u n n h h e e a a t t e e d d e e q q u u i i p p m m e e n n t t r r o o o o m m i i s s n n o o t t t t h h e e T T r r a a n n e e
c c o o m m p p a a n n y y ' ' s s r r e e s s p p o o n n s s i i b b i i l l i i t t y y . . T T h h e e s s e e a a r r e e i i n n d d o o o o r r u u n n i i t t s s . .
N N O O T T I I C C E E
CDHF-SVX01N-EN