CHAPTER 14 - CHECK-OUT PROCEDURES

NOTICE
Perform the following check-out procedures
as
outlined
and
completed. When procedures are completed,
the installer should complete the installation
record in Chapter 15 on page 8180.
q Boiler system fluid chemistry checked and verified
as outlined in Section 10.1 on page
q Boiler system was completely flushed to remove
any debris/sediment.
q Any automatic air vents placed within the system
are open one full turn.
q Air is purged from the heating zones and boiler
system piping.
q If applicable, confirm that the burner has been
properly configured for Propane as outlined in
Section 7.3 on page
41.
q Thermostat circuit wiring checked and verified that
no voltage is present as outlined in Section 10.6 on
page
70.
q Operating Instructions were followed during start-
up.
q Combustion levels and flame pattern verified as
outlined in Section 11.3.5 on page 74.
check
off
items
as
67..
q Measured the rate of input on Natural Gas as
outlined in Section 11.3.5 on page 74.
q Test high temperature limit as outlined in Section
11.3.6 on page 74.
q Checked the incoming gas pressure at the unit
more than 5"w.c. and less than 13"w.c. for Natural
Gas and more than 8"w.c. and less than 13"w.c. for
LP with all gas appliances ON and OFF.
q Adjusted balancing valves and system limit controls
to provide design temperatures to the primary
space heating system.
q In multiple zone applications, adjusted for correct
flow of boiler water to each zone.
q Checked and verified room thermostat(s) function
properly and the thermostat(s) heat anticipator (if
used) was properly set.
q Observed several operating cycles for proper
operation of the EXALT and the system.
q Set the room thermostat(s) to the desired room
temperature.
q Reviewed all instructions shipped with the EXALT
with the homeowner or maintenance personnel.
q Completed the Installation Record of Chapter 15
on page 81.
q Ensure all manuals and other documents are re-
turned to the Installation envelope and given to
the owner for safekeeping.