8. Route the long hose under the radiator frame, over the
frame cross member, and along the frame rail to the
valve
(Figure
20).
Note: The long hose will follow another hose from
the transmission bay to the valve assembly.
Figure 20
1. Cable tie
2. Long hose
9. Secure the long hose with 4 cable ties
10. Secure the hose fitting to the straight fitting
3. Valve
(Figure
20).
(Figure
5
Installing the Relays and
Switches
Model 30810
Parts needed for this procedure:
1
Relay bracket
6
Relay
6
Bolt (1/4 x 1/2 inch)
7
Nut (1/4 inch)
1
Bolt (1/4 x 3/4 inch)
1
Decal (from Auxiliary Power Unit Kit)
2
Switch
Procedure
19).
1. On the right side of the machine, mount 6 relays onto
the relay bracket using 6 bolts (1/4 x 1/2 inch) and 6
nuts (1/4 inch) as shown in
1. Bolt (1/4 x 1/2 inch)
2. Relay
3. Nut (1/4 inch)
4. Support-tube bolt
2. Remove the bolt and nut from the support tube.
3. Using a bolt (1/4 x 3/4 inch), nut (1/4 inch), and the
bolt and nut that you just removed, mount the relay
bracket to the machine
9
Figure
21.
Figure 21
5. Support-tube nut
6. Relay bracket
7. Bolt (1/4 x 3/4 inch)
(Figure
21).